Fraîche Flow

Linux · Infrastructure · Networking · Virtualisation

docs/Acceptance, recovery and operational handover
54 lines2.23 KB

Acceptance, recovery and operational handover

Fraîche Flow · IT Systems Integration

Project objective

Hand over the implemented lab infrastructure transparently using requirements, tests, risks and recovery dependencies.

My implementation

  • Assessed requirements, evidence, acceptance criteria and blockers in the project context.
  • Documented the roles of the participating systems and the end-to-end verification path.
  • Recorded a file-based restore result and a recovery procedure.
  • Produced a runbook and technical materials for handing over the lab work.

Technical context

Completion All tasks addressed according to the project lead
Evidenced chain DNS → SSH/HTTP → application; backup → comparison → disconnection
Monitoring 15 endpoints online in the final view
Operational context Training/practical lab; no production acceptance claimed

Result

The technical lab state is documented. Project completion is based on the completion confirmation and available output. This does not establish a production SLA, full restore or formal customer sign-off.

Verification and operational evidence

systemctl is-active apache2 mariadb docker cron
docker ps
findmnt /mnt/backup
sudo iscsiadm -m session

Technical acceptance with active services, running containers, reachable web services and disconnected backup target

Practical troubleshooting

Incident handling showed why online status, historical availability and actual application tests must be assessed separately. A powered-off TrueNAS host was correctly detected as a failure.

Security and technical context

For production transfer: rotate secrets, restrict network exposure, test consistent database backups and a full restore, and demonstrate the notification chain. These are recommendations for further development, not retrospectively invented lab failures.

Transferable skills

Operational documentation, risk assessment, recovery planning and transparent handover.

Project status

Completed according to confirmation from the project lead.